Error nbjm (pid=293) NBU status: 800, EMM status: No drives are available resource request failed (800)"

$
0
0
I need a solution

Hi Team,

  Need help regarding the error "Error nbjm (pid=293) NBU status: 800, EMM status: No drives are available 

resource request failed (800)" 

 

 i try to reconfigured the tape drive using the configure storage and it was ok, but if i try to start manually it was failed.

the how to locate the string 

" Try the following: 

Locate the EMM reason string, correct the problem, and rerun the job.


Viewing all articles